Difference between revisions of "User:Nick H"
From DoyleGroup
(→Future Lablog Entries) |
(→To Do) |
||
Line 27: | Line 27: | ||
* Re-take 60 sccm long data | * Re-take 60 sccm long data | ||
* take 100sccm long data | * take 100sccm long data | ||
+ | |||
+ | === Other === | ||
+ | |||
+ | * Get turbo set up | ||
+ | * Start preparing for the move |
Revision as of 08:13, 4 May 2010
Future Lablog Entries
- Rotational Temperatures
- Need error bars
- Most important FOM: J=1 population
- Consistent with simple estimates and simulations
- _Maybe_ consistent with longitudinal data?
- Transverse and Longitudinal
- Vertical binning --> temperatures are consistent
- Amount of cooling is consistent with beam freezing a few cm downstream
- Mach number of ~10 is not consistent with this
To Do
Analysis
- Longitudinal widths
- 60 and 100 sccm trans widths (with norm)
- Skimmer transmission - divergence relation
- Does temp matter?
- Finish fluor rot temp
- Plots of J=1 (not normed) after skimmer vs flow
Data taking
- Re-take 60 sccm long data
- take 100sccm long data
Other
- Get turbo set up
- Start preparing for the move