Difference between revisions of "BEC:Internal"
From DoyleGroup
(→Cryogenic NH Discharge) |
(→7-30-2009) |
||
Line 2: | Line 2: | ||
====7-30-2009==== | ====7-30-2009==== | ||
+ | To do list: | ||
+ | # Solder heatsink | ||
+ | # Testing resonant frequency of RF coil (147.2 MHz) | ||
+ | # Thermal cycle wire | ||
+ | # Close cell, leak check at room temperature. | ||
+ | # Close dewar, cool down | ||
+ | |||
+ | Equipments needed: | ||
+ | # Vacuum pump | ||
+ | # Thermometry | ||
+ | ** Ordered | ||
+ | |||
+ | # |
Revision as of 16:40, 30 July 2009
Cryogenic NH Discharge
7-30-2009
To do list:
- Solder heatsink
- Testing resonant frequency of RF coil (147.2 MHz)
- Thermal cycle wire
- Close cell, leak check at room temperature.
- Close dewar, cool down
Equipments needed:
- Vacuum pump
- Thermometry
- Ordered