Difference between revisions of "BEC:Internal"

From DoyleGroup
Jump to: navigation, search
(7-30-2009)
(7-30-2009)
Line 12: Line 12:
 
# Vacuum pump
 
# Vacuum pump
 
# Thermometry
 
# Thermometry
** Ordered
+
* Ordered DT-670-CU-1.4L silicon diodes from Lakeshore
 
+
# AC amplifier
#
+
# Helium buffer gas source
 +
# Gas handling system for entraining NH3 into helium
 +
# Dewar mounting plate

Revision as of 16:43, 30 July 2009

Cryogenic NH Discharge

7-30-2009

To do list:

  1. Solder heatsink
  2. Testing resonant frequency of RF coil (147.2 MHz)
  3. Thermal cycle wire
  4. Close cell, leak check at room temperature.
  5. Close dewar, cool down

Equipments needed:

  1. Vacuum pump
  2. Thermometry
  • Ordered DT-670-CU-1.4L silicon diodes from Lakeshore
  1. AC amplifier
  2. Helium buffer gas source
  3. Gas handling system for entraining NH3 into helium
  4. Dewar mounting plate