Difference between revisions of "BEC:Internal"

From DoyleGroup
Jump to: navigation, search
(Cryogenic NH Discharge)
(7-30-2009)
Line 2: Line 2:
  
 
====7-30-2009====
 
====7-30-2009====
 +
To do list:
 +
# Solder heatsink
 +
# Testing resonant frequency of RF coil (147.2 MHz)
 +
# Thermal cycle wire
 +
# Close cell, leak check at room temperature.
 +
# Close dewar, cool down
 +
 +
Equipments needed:
 +
# Vacuum pump
 +
# Thermometry
 +
** Ordered
 +
 +
#

Revision as of 16:40, 30 July 2009

Cryogenic NH Discharge

7-30-2009

To do list:

  1. Solder heatsink
  2. Testing resonant frequency of RF coil (147.2 MHz)
  3. Thermal cycle wire
  4. Close cell, leak check at room temperature.
  5. Close dewar, cool down

Equipments needed:

  1. Vacuum pump
  2. Thermometry
    • Ordered