Difference between revisions of "BEC:Internal"
From DoyleGroup
(→7-30-2009) |
(→7-30-2009) |
||
Line 17: | Line 17: | ||
# Gas handling system for entraining NH3 into helium | # Gas handling system for entraining NH3 into helium | ||
# Dewar mounting plate | # Dewar mounting plate | ||
+ | |||
+ | |||
+ | ====Quote==== | ||
+ | *[http://laserstorm.harvard.edu/wiki/images/0/02/SO_54360_Harvard_Univ.pdf Lakeshore diode] |
Revision as of 10:37, 3 August 2009
Cryogenic NH Discharge
7-30-2009
To do list:
- Solder heatsink
- Testing resonant frequency of RF coil (147.2 MHz)
- Thermally cycle cell components
- Close cell, leak check at room temperature.
- Close dewar, cool down
Equipments needed:
- Vacuum pump
- Thermometry
- Ordered DT-670-CU-1.4L silicon diodes from Lakeshore
- AC amplifier
- Helium buffer gas source
- Gas handling system for entraining NH3 into helium
- Dewar mounting plate