Difference between revisions of "OMAX:Startup"
From DoyleGroup
(Created page with '== OMAX Startup/Cut/Shutdown Checklists == * Machine Startup ** Put a medical card in your pocket ** Turn on water supply ** Turn on air supply and check pressure = 75-80 PSI ** ...') |
(→OMAX Startup/Cut/Shutdown Checklists) |
||
Line 11: | Line 11: | ||
** Check if you have to rotate jewel slightly | ** Check if you have to rotate jewel slightly | ||
*** Counter-clockwise with respect to looking at top of jewel | *** Counter-clockwise with respect to looking at top of jewel | ||
− | |||
* Programming Setup | * Programming Setup | ||
** Clean up drawing | ** Clean up drawing |
Revision as of 08:07, 7 August 2009
OMAX Startup/Cut/Shutdown Checklists
- Machine Startup
- Put a medical card in your pocket
- Turn on water supply
- Turn on air supply and check pressure = 75-80 PSI
- Turn on electrical and startup computer
- Turn on pre-charge pump
- Check filter pressures = ~120 PSI, differential < 20 PSI
- Rotate nozzle slightly
- Counter-clockwise with respect to you looking down on nozzle
- Check if you have to rotate jewel slightly
- Counter-clockwise with respect to looking at top of jewel
- Programming Setup
- Clean up drawing
- Double-check tool path!
- Cutting Setup
- Turn off pre-charge pump or move nozzle far out of the way before putting your hands in the cutting region!
- Clamp your piece in place
- Use extra pieces of stock if the clamps are not long enough
- Do not clamp too tightly – can cause part to bow and hit nozzle
- Use sacrificial material if finish matters
- Be careful not to cut your hands on the slats
- Move the nozzle to the path starting point and set Z zero – 60 mil above sample
- Make a home point and set the path start home
- Raise nozzle, put on muff, then return to Z zero
- Check material type and thickness
- Have nozzle move to extents, or do a dry run
- Turn on pre-charge pump
- Raise water level to about half-way up the muff
- Place hand on piece near edge to make sure it stays in place
- Warn bystanders if necessary
- Start cut
- Machine Shutdown
- Clean out the muff
- Clear temporary homes
- Shut down computer
- Turn off SRS
- Turn off electrical, water, air
- Return medical card
- Spray down the machine and put tools and stock away
- Don't forget your USB drive!