BEC:Internal
From DoyleGroup
Cryogenic NH Discharge
7-30-2009
To do list:
- Solder heatsink
- Testing resonant frequency of RF coil (147.2 MHz)
- Thermal cycle wire
- Close cell, leak check at room temperature.
- Close dewar, cool down
Equipments needed:
- Vacuum pump
- Thermometry
- Ordered